Why Californians are
going solar now.

With the highest electricity rates in the contiguous US and annual increases that show no sign of slowing, smart homeowners are locking in their energy costs today.

Beat Rising Utility Rates

California electricity rates are among the highest in the country. The major utilities — PG&E, SCE, and SDG&E — have raised rates by 3-5% annually over the past decade, and recent rate cases suggest this trend will continue.

For a household spending $250/month today, a 4% annual increase means paying over $370/month within 10 years — and over $550/month within 20 years. That's your money going to utility shareholders.

Rates have doubled

in the last 10 years across major CA utilities.

The Ultimate Inflation Hedge

Unlike your utility bill, a solar payment does not go up. Once your system is installed, your energy cost is locked in for the life of the system — typically 25 years or more.

The PurePower Bill‑Lock Solar Plan™ replaces an unpredictable, rising utility bill with a fixed monthly payment that is lower from day one. As utility rates climb year after year, your locked-in rate becomes an even better deal.

25-Year Price Lock

Your rate stays exactly the same, decades from now.

Increase Your Home Value

Research from the Lawrence Berkeley National Laboratory shows that homes with solar systems sell for approximately 4% more than comparable homes without solar. On a $750,000 California home, that is roughly $30,000 in added equity.

Buyer surveys consistently show that energy efficiency and solar panels are among the most desired home features. As electricity costs continue to rise, buyers increasingly view solar as a practical asset rather than a novelty.

+4%

Average Home Value Increase

According to Berkeley Lab research

What to expect.

A typical residential solar installation in California takes 30-60 days from signed agreement to system activation. We handle everything.

Week 1-2

Design & Engineering

We finalize your system design, conduct site assessments, and prepare permit documents.

Week 2-4

Permitting

We submit and manage all paperwork with your local city or county jurisdiction.

Week 4-6

Installation

Physical installation typically takes 1-3 days. We schedule at your convenience.

Week 6-8

Interconnection

Your utility reviews and approves the grid connection. Your system goes live.